top of page

Modernising Waste Throughput at Mogden Sewage Treatment Works

Apr 20
2 min read

Updated: Sep 26

How a critical upgrade of RORO skip compactors at the UK’s third-largest treatment site ensured operational resilience and future capacity.





Project Overview: Scaling for a 60-Square-Mile Catchment

Operated by Thames Water, Mogden Sewage Treatment Works is a cornerstone of London’s infrastructure. Serving over 2 million people, the site processes up to 20 tonnes of waste daily while generating renewable energy.


To maintain its critical role in protecting the River Thames, the facility required a comprehensive replacement of four Roll-on Roll-off (RORO) skip compactors. The goal: maintain existing operations while scaling throughput to meet future demand.



The Challenge: Seamless Integration & Continuity

The project demanded a complex integration of new Thetford industrial compactors  with both legacy systems and ongoing sitewide upgrades. Key priorities included:


  • Operational Continuity: Maintaining 24/7 sewage processing during the transition.

  • Robust Engineering: Delivering heavy-duty equipment capable of handling high-volume, abrasive waste.

  • Maintenance Efficiency: Designing a layout for rapid skip changes and simplified servicing.



The Solution: Customised Thetford Compaction Systems

In collaboration with the client and Kier Group plc , who managed the wider £66m refurbishment, we designed and manufactured a bespoke solution featuring:


  • High-Capacity RORO Compactors: Specifically engineered for the rigorous demands of large-scale wastewater treatment .

  • Bespoke Feed Hoppers: Tailored to integrate seamlessly with the site’s upgraded screening and processing equipment.

  • Local Control Panels: Ensuring safe, compliant, and intuitive operation for on-site teams.



Results: Future-Proofed Infrastructure

The project—spanning design, manufacture, and commissioning—was delivered successfully over several months.


  • Increased Capacity: The site is now equipped to handle projected population growth and higher waste volumes.

  • Enhanced Reliability: Robust construction reduces unscheduled downtime and maintenance costs.

  • Safety & Compliance: A fully integrated system layout that meets the highest environmental and operational standards.


 

Modernising your treatment infrastructure?

Ensuring operational continuity during a major upgrade requires precision engineering and a collaborative approach. Whether you're scaling for future demand or replacing legacy systems, our team provides the robust solutions you need.




 
 
 

Comments


Go

Need Help Choosing the Right Compactor?

Our team provides professional guidance on selecting the right waste compaction equipment for your business. We can assess your site, evaluate waste volumes and recommend a system designed to improve efficiency and reduce disposal costs.

​

Submit your details and we’ll get in touch to discuss your requirements.

Contact Us

bottom of page